ISO-Technical Colloquium is scheduled from 5pm to 6pm at G&P's Conference Room.
| Date |
Title Of Talks |
Name Of Staff |
| 03/01/2012 |
Standard Penetration Test & Mackintosh Test |
IR. LOW CHEE LEONG |
| 05/01/2012 |
Procedure for PQP |
MS. HOW JA-MIE |
| 11/01/2012 |
Geological Study for MRT Project |
MR. TIONG CHIONG NGU |
| 17/01/2012 |
Vane Shear Test |
IR. LEE PEIR TIEN /IR. SHAFINA SABARUDDIN
|
| 02/02/2012 |
Procedure for Design Control |
MR. NG LEANG YEOW |
| 02/02/2012 |
Overview on Peat |
MR. PUSPANATHAN SUBRAMANIAM |
| 08/02/2012 |
Point Load Test |
IR. LOH YEE ENG |
| 09/02/2012 |
Improved Installation Procedure for Jack-in Pile |
IR. LIEW SHAW SHONG |
| 15/02/2012 |
Investigation of a Failed Retaining Wall |
IR. JACK PAN KOK LOONG |
| 16/02/2012 |
Lesson Learnt from Design of SL 123 |
MS. NOOR AZLINA BTE AZHARI |
| 21/02/2012 |
Behaviour of Open-Ended Pile |
IR. CHOW CHEE MENG |
| 22/02/2012 |
Permeability Test |
|
| 28/02/2012 |
Effective Stress |
IR. TAN YEAN CHIN |
| 01/03/2012 |
Procedure for Quality Records |
MR. PUSPANATHAN SUBRAMANIAM |
| 07/03/2012 |
River Closure Design |
IR. LEE PEIR TIEN |
| 08/03/2012 |
Case Histories on Disputes for Pile Foundation |
IR. DR. GUE SEE SEW |
| 15/03/2012 |
PT TUM 60 MT Palm Oil Mill |
IR. CHEAH SIEW WAI |
| 21/03/2012 |
Shear Strength |
IR. TAN YEAN CHIN |
| 20/03/2012 |
Earthwork Compaction |
IR. WONG YIK FONG |
| 27/03/2012 |
Stress in Soil Masses/Stress Path (Part 1) |
IR. TAN YEAN CHIN |
| 29/03/2012 |
Foundation Design for Hospital |
IR. SHAFINA SABARUDDIN |
| 05/04/2012 |
Procedure for Document and Data Control |
MR. GU KOK KIN, KENT |
| 10/04/2012 |
Stress in Soil Masses/Stress Path (Part 2) |
IR. TAN YEAN CHIN |
| 19/04/2012 |
Things to Note in Modelling of Groundwater Table in PLAXIS |
IR. LOH YEE ENG |
| 24/04/2012 |
Introduction to Critical Sate Soil Mechanics (Part 1) |
IR. TAN YEAN CHIN |
| 26/04/2012 |
Geotechnical Inspection |
IR. TING DENG ING |
| 30/04/2012 |
Simple Approach in Geotech Engineer |
IR. TAN YEAN CHIN |
| 03/05/2012 |
Introduction to ISO Standard |
IR. CHOONG KEAN WUI |
| 08/05/2012 |
Introduction to Critical Sate Soil Mechanics (Part 2) |
IR. TAN YEAN CHIN |
| 10/05/2012 |
KVMRT Outline Design Introduction |
IR. KOO KUAN SENG |
| 17/05/2012 |
Undrained Shear Strength Before & After Surcharge (Bandar Botanic) |
MS. NURUL AINAA BTE SELAMAT |
| 22/05/2012 |
Permeability & Seepage |
DR. WONG SHIAO YUN |
| 24/05/2012 |
Ground Anchor Design and Construction |
IR. HO SHU FENG |
| 29/05/2012 |
Deformability / Consolidation |
IR. CHEAH SIEW WAI |
| 31/05/2012 |
Foundation Design for Platinum Park |
MR. NG LEANG YEOW |
| 05/06/2012 |
Characterisation of Soils for Engineering Purposes |
IR. CHOW CHEE MENG |
| 07/06/2012 |
Procedure for Internal Quality Audit |
MR. TONG HAN SENG |
| 14/06/2012 |
Basement Wall Design for Condominium at Jalan Tun Razak |
IR. DR. WONG SHIAO YUN |
| 19/06/2012 |
Soil Slope Stability |
MS. TEI CHEW LING |
| 21/06/2012 |
Alternative Design for TC Building |
IR. LOW CHEE LEONG |
| 28/06/2012 |
Slope Strengthening Works at Jalan Wangsa 1, Bukit Antarabangsa |
MR. TONG HAN SENG |
| 03/07/2012 |
Rock Slope Stability |
MR. TIONG CHIONG NGU |
| 05/07/2012 |
Procedure for Design, Review, Verification & Validation |
MR. ASHTON HONG BOON KHANG |
| 12/07/2012 |
Earthwork Design at Wangsa Maju |
MS. TEI CHEW LING |
| 17/07/2012 |
Retaining Structure |
IR. TING DENG ING |
| 19/07/2012 |
Westside 2, Desa Parkcity |
MR. KENT GU KOK KIN |
| 26/07/2012 |
Risk of Damage Assessment for Tunneling |
MR. ASHTON HONG BOON KHANG |
| 31/07/2012 |
Design of Retaining Wall and Support Systems for Deep Basement Construction |
IR. CHOW CHEE MENG |
| 02/08/2012 |
Procedure for Client Feedback |
MS. LING EE NING |
| 07/08/2012 |
Ground Improvement |
IR. SHAFINA SABARUDDIN/IR. LEE PEIR TIEN |
| 09/08/2012 |
Type of Soil Slope Strengthening |
MS. KANG YEE PING |
| 14/08/2012 |
Shallow Foundation |
IR. CHOW CHEE MENG |
| 16/08/2012 |
Slope Hydrology Analysis |
MS. TEH WAI SAN |
| 23/08/2012 |
Stormwater Management and Road Tunnel |
MR. LAM YOKE WOH |
| 28/08/2012 |
Cone Penetration Test (CPU/CPTU) |
IR. TING DENG ING |
| 30/08/2012 |
Earthquake Design Consideration in Pile Foundation |
MR. CHOONG KEAN WUI |
| 06/09/2012 |
Procedure for Product Identification and Traceability |
MR. LEE YAP CHONG, JOHN |
| 11/09/2012 |
Settlement Analysis |
IR. HO SHU FENG |
| 13/09/2012 |
Piled Embankment at Pontian Johor |
MS. HOW JA-MIE |
| 20/09/2012 |
Improvement Works to Alleviate Softground Problem at KM 142- 158 BB (Light weight Concrete BEPS) |
MR. AHMAD SYAZWAN BIN MOHD SUKARNO |
| 25/09/2012 |
Static Pile Load Test |
IR. DARRYL FONG CHEW CHUNG |
| 04/10/2012 |
ISO 9001 Overview |
MR. AHMAD SYAZWAN BIN MOHD SUKARNO |
| 09/10/2012 |
Deep Foundation |
IR. JACK PAN KOK LOONG |
| 11/10/2012 |
Rock Mass Classification |
MR. TIONG CHIONG NGU |
| 23/10/2012 |
High Strain Dynamic Pile Test |
IR. LOH YEE ENG |
| 25/10/2012 |
Overview of Happy Garden Condo Foundation |
MS. KHOO LAI PENG |
| 01/11/2012 |
Procedure for Site Supervision Plan |
MR. LIANG YIT CHUNG, STEVE |
| 06/11/2012 |
Pull Out Test for Soil Nail |
IR. KOO KUAN SENG |
| 08/11/2012 |
Road Alignment Design by Using Pad |
MS. HAYATUL HUSNA BT KAMARUDDIN |
| 15/11/2012 |
Foundation Design System for Robertson Road |
MR. VINCENT VOON BOO CHUAN |
| 20/11/2012 |
Introduction to PLAXIS Finite Element Analyses |
IR. LOW CHEE LEONG |
| 22/11/2012 |
Geotechnical Review for Foundation of Medical Borneo Hospital |
MR. KHAW YONG HUI |
| 29/11/2012 |
RS Wall for New Proposed Road at Puchong |
MS. CHAN JIA YING |
| 04/12/2012 |
Training for SAFE |
IR. CHEAH SIEW WAI |
| 06/12/2012 |
Procedure on Role of Checker & Reviewer |
MS. WAN NURULHIDAYAH BTE WAN HUSSIN |
| 13/12/2012 |
Pavement Response |
MR. JASON LIM AING HO |
| 18/12/2012 |
Introduction to PDS |
IR. DR. WONG SHIAO YUN |
| 20/12/2012 |
Overview on Biz Suites Project |
MS. ONG KAH PENG |
| 27/12/2012 |
Overview on Commonly Adopted Soft Ground Treatment |
MR. WONG LIT KUANG, KEVIN |