ISO-Technical Colloquium is scheduled from 5pm to 6pm at G&P's Conference Room.
| Date |
Title Of Talks |
Name Of Staff |
| 07/01/2009 |
One-Dimensional Consolidation Test |
IR. LEE PEIR TIEN |
| 08/01/2009 |
Consolidated Isotropic Undrained (CIU) Test |
IR. CHOW CHEE MENG |
| 09/01/2009 |
Eko Pulp & Paper Mill |
MR. CLAUDE PERERA |
| 13/01/2009 |
Procedure for PQP |
IR. LOW CHEE LEONG |
| 20/01/2009 |
Settlement Analysis |
IR. HO SHU FENG |
| 21/01/2009 |
Six Sigma |
IR. CHOW CHEE MENG |
| 22/01/2009 |
Consideration and Design of Cooling Towers |
IR. CHEAH SIEW WAI |
| 03/02/2009 |
Shallow Foundation |
IR. CHOW CHEE MENG / IR. LOW CHEE LEONG |
| 05/02/2009 |
Procedure for Design Control |
MR. WONG CHEN JACK |
| 18/02/2009 |
Pile Foundation for Retaining Wall |
IR. LEE SEONG TATT |
| 19/02/2009 |
Tank Farm Foundation Design |
IR. LIEW SHAW SHONG |
| 23/02/2009 |
Chemical Testing |
MS. TAN SJE TING |
| 24/02/2009 |
Geotechnical Engineering Challenges for Highway Design and Construction |
IR. DR. GUE SEE SEW |
| 02/03/2009 |
Procedure for Quality Records |
IR. LEE PEIR TIEN |
| 03/03/2009 |
Cone Penetration Test (CPT/CPTU) |
MR. TING DENG ING |
| 10/03/2009 |
Deep Foundation |
MR. BRYAN LEE CHEE BOON |
| 17/03/2009 |
Static Pile Load Test |
MR. DARRYL FONG CHEW CHUNG |
| 19/03/2009 |
FEM Analysis for Embankment Over Softground Area |
MR. KOO KUAN SENG |
| 23/03/2009 |
Construction of Retaining Wall (RC & RS) on Fill Ground |
MR. ASIF BIN ABDULLAH SHAH AIMIN |
| 26/03/2009 |
Pile Strip Raft Construction at Bandar Bukit Raja, Klang |
MS. NUR HAYATI bte ABDUL RAHMAN |
| 31/03/2009 |
High Strain Dynamic Pile Test |
MR. FONG FEI SEONG |
| 09/04/2009 |
Application of Consolidation Theory to Practise |
IR. SHAFINA SABARUDDIN |
| 14/04/2009 |
Ground Improvement |
IR. SHAFINA SABARUDDIN |
| 16/04/2009 |
Procedure for Design, Review, Verification & Validation |
MR. TAY JOO KING |
| 23/04/2009 |
RC Wall Design Basis for Electrified Double Tracking Project |
MR. TING DENG ING |
| 28/04/2009 |
Jack-in Pile (RC & Spun) |
MR. FONG FEI SEONG |
| 30/04/2009 |
ABF Cooling Tower Foundation and Design Issues |
MR. LIM FANG LIANG |
| 07/05/2009 |
Foundation on Granite Formation - Lessons Learnt from Neo Damansara |
IR. HO SHU FENG |
| 12/05/2009 |
Driven Pile (RC & Spun) |
IR. HO SHU FENG |
| 21/05/2009 |
Summary of Understanding Contract (Part 1) |
MR. WONG YIK FONG |
| 21/05/2009 |
Procedure for Document and Data Control |
MS. LAU LIH SHIONG |
| 26/05/2009 |
Reinforced Concrete (RC) Wall |
MR. WONG YIK FONG |
| 28/05/2009 |
Top-Down Construction |
MS. LOH YEE ENG |
| 09/06/2009 |
Soil Nail |
IR. TING DENG ING |
| 10/06/2009 |
Bi-directional Static Load Test |
IR. LEE SEONG TATT |
| 18/06/2009 |
Introduction to ISO Standard |
IR. CHEAH SIEW WAI |
| 23/06/2009 |
Prefabricated Vertical Drain (PVD) |
IR. SHAFINA SABARUDDIN |
| 24/06/2009 |
Hazard & Risk Assessment |
DR. WONG SHIAO YUN |
| 25/06/2009 |
Langsat Terminal (One) & Langsat CTF at the Port of Tg. Langsat, Johor |
MS. NOOR AZLINA bte AZHARI |
| 03/07/2009 |
Literature Study - Site Investigation (Description and Classification of Soils and Rocks) |
EN. CHE NORHISHAM BIN CHE DAUD / EN. AHMAD SYUKRAN BIN ISHAK / EN. MOHD IDHAM BIN MANSOR / EN. MUHAMMAD THARIQ BIN JUSOF KHADIDI |
| 07/07/2009 |
Geotechnical Data-Evaluation of CPT Testing |
IR. SHAFINA SABARUDDIN |
| 09/07/2009 |
Earthwork Design for Taman Bukit Kepayang (Phase M1) |
IR. TING DENG ING |
| 13/07/2009 |
How To Be A Good Engineer |
IR. TAN YEAN CHIN |
| 15/07/2009 |
Jack-in Pile Design |
IR. CHOW CHEE MEING |
| 16/07/2009 |
Basement Excavation for Platinum Park |
IR. KHOO CHEE MIN |
| 21/07/2009 |
Geotechnical Data-Shear Strength Derivation |
IR. LOW CHEE LEONG |
| 23/07/2009 |
Procedure for Internal Quality Audit |
MS. DIANA bte CHE LAT |
| 23/07/2009 |
Pile Strip Raft at Batu Pahat (Part 2) |
MR. JEREMY LIM WEI |
| 24/07/2009 |
Literature Study - Site Investigation (Subsurface Exploration: Engineering Geophysics) |
EN. MOHD ZUL IQBAL BIN HAMZAH / EN. FAROUK RAZLAN BIN ABDUL RAHIM / CIK ZULHAIDA bte ZULKEPELI |
| 04/08/2009 |
Shallow Foundation |
IR. CHEAH SIEW WAI / MR. CHOONG KIEAN WUI |
| 06/08/2009 |
Double Track |
IR. LEE PEIR TIEN |
| 07/08/2009 |
Literature Study - Site Investigation |
MR. TIONG CHIONG NGU |
| 11/08/2009 |
Proposed to Pulau Indah Ring Road |
MR. WONG CHEN JACK |
| 18/08/2009 |
Pile Foundation |
DR. WONG SHIAO YUN/MR. LEE CHEE BOON |
| 20/08/2009 |
Procedure for Site Supervision Plan |
MS. NOOR AZLINA bte AZHARI |
| 21/08/2009 |
Literature Study - Site Investigation (In-situ Testing) |
EN. MOHD HASHRIQ BIN TALIB / EN. MOHD ZULKARNAIN BIN ABDUL MANAN |
| 27/08/2009 |
Bebo Arch Pedestrian Bridge Across Sg. Melaka |
MS. TEI CHIEW LING |
| 03/09/2009 |
Seismic Refraction Survey |
MS. LAU LIH SHIONG |
| 04/09/2009 |
Literature Study - Site Investigation (Sampling and Sample Disturbance) |
EN. SUFAIZI BIN ISMAIL / EN. MOHD ZAHIR BIN NORDIN |
| 08/09/2009 |
Retaining Structures-External Stability (RC Wall & Gravity Wall) |
IR. HO SHU FENG |
| 10/09/2009 |
Investigation on Slope Erosion at Tamar TAR 2 Boundary |
MR. FONG FEI SEONG |
| 11/09/2009 |
Literature Study - Site Investigation (The Desk Study and Walk-Over Survey) |
MR. TIONG CHIONG NGU |
| 14/09/2009 |
Borehole Drilling Practice Today |
MS. KHOO MEI AI |
| 15/09/2009 |
Retaining Structures-External Stability (Reinforced Soil Wall) |
IR. DARRYL FONG CHEW CHUNG |
| 17/09/2009 |
Procedure for Client Feedback |
MS. NURUL AINAA bte SELAMAT |
| 18/09/2009 |
Literature Study - Site Investigation |
EN. WAN A.D.ADLY BIN WAN AZMY / EN. MOHD SHAIRUL ASWAN BIN ROSLAN |
| 24/09/2009 |
Write Like a Professional |
IR. LOW CHEE LEONG |
| 01/10/2009 |
Foundation Design for Warehouse & Distribution Centre |
MR. CHOONG KEAN WUI |
| 02/10/2009 |
Literature Study - Site Investigation (Subsurface Exploration: Boring, Drilling, Probing and Trial Pitting) |
EN. WAN A.D.ADLY BIN WAN AZMY / EN. MOHD SHAIRUL ASWAN BIN ROSLAN |
| 06/10/2009 |
Retaining Structures-External Stability (Embedded Wall) |
MR. FONG FEI SEONG (IR. TAN YEAN CHIN) |
| 08/10/2008 |
Laboratory Soil Test |
MR. NG LEANG YEOW |
| 13/10/2009 |
Hydraulic Failure |
MR. KOO KUAN SENG |
| 15/10/2009 |
Interpretation of Piezocone |
MR. AHMAD SYAZWAN BIN MOHD SUKARNO |
| 22/10/2009 |
Procedure for Product Identification and Traceability |
MR. BRYAN LEE CHEE BOON |
| 28/10/2009 |
Standard Penetration Test |
IR. KHOO CHEE MIN |
| 29/10/2009 |
Role of Geotechnical Engineer |
IR. LIEW SHAW SHONG |
| 30/10/2009 |
Literature Study - Site Investigation (Planning and Procurement) |
EN. CLAUDE PERERA / EN. FADHLIL WAFI BIN ISHAK |
| 03/11/2009 |
Laboratory Soil Test (CIU & Direct Shear Box) |
MR. NG LEANG YEOW / EN. KHOMAEDI HOMAINI |
| 05/11/2009 |
Interpretation of High Strain Dynamic Load Test |
MR. DARRYL FONG CHEW CHUNG |
| 06/11/2009 |
Literature Study - Site Investigation (Basic Field Instrumentation for Site Investigation) |
EN. MUHAMAD NAJIB BIN ISMAIL |
| 17/11/2009 |
Design of Lateral Pile |
MR. BRYAN LEE CHEE BOON |
| 18/11/2009 |
Mackintosh Probe |
IR. KHOO CHEE MIN |
| 18/11/2009 |
Subsurface Investigation (SI) Database & Electronic - BOQ |
IR. CHEAH SIEW WAI |
| 19/11/2009 |
ISO 9001 Overview |
MR. ROBIN WONG KAH HOE |
| 20/11/2009 |
Literature Study - Site Investigation (Undisturbed Sampling Techniques) |
EN. ALIAS BIN HAMZAH |
| 24/11/2009 |
Permeability Test |
MR. CHOONG KEAN WUI |
| 26/11/2009 |
Investigation into Retaining Wall Failure at Ecooils Processors Sdn Bhd, Nilai |
MR. LIM FANG LIANG |
| 03/12/2009 |
Residential Houses in Western Australia |
MR. ROBIN WONG KAH HOE |
| 08/12/2009 |
Vane Shear Test |
IR. LEE PIER TIEN / IR. SHAFINA SABARRUDIN |
| 10/12/2009 |
Pile Testing |
MS. TAN SJE TING |
| 15/12/2009 |
Retaining Wall |
MR. JEREMY LIM WEI |
| 17/12/2009 |
Foundation Settlement (Prediction: An Approximate Method) |
MR. KOO KUAN SENG |
| 22/12/2009 |
Point Load Test |
IR. LEE SEONG TATT |
| 24/12/2009 |
Procedure on Role of Checker & Reviewer |
IR. CHEAH SIEW WAI |