ISO-Technical Colloquium is scheduled from 5pm to 6pm at G&P's Conference Room.
Date |
Title Of Talks |
Name Of Staff |
7/1/2009 |
One-Dimensional Consolidation Test |
IR. LEE PEIR TIEN |
8/1/2009 |
Consolidated Isotropic Undrained (CIU) Test |
IR. CHOW CHEE MENG |
| 9/1/2009 |
Eko Pulp & Paper Mill
|
MR. CLAUDE PERERA |
13/1/2009
|
Procedure for PQP
|
IR. LOW CHEE LEONG |
20/1/2009
|
Settlement Analysis
|
IR. HO SHU FENG |
21/1/2009 |
Six Sigma
|
IR. CHOW CHEE MENG |
22/1/2009 |
Consideration and Design of Cooling Towers
|
IR. CHEAH SIEW WAI |
3/2/2009 |
Shallow Foundation
|
IR. CHOW CHEE MENG / IR. LOW CHEE LEONG |
5/2/2009
|
Procedure for Design Control
|
MR. WONG CHEN JACK |
18/2/2009
|
Pile Foundation for Retaining Wall
|
IR. LEE SEONG TATT |
19/2/2009
|
Tank Farm Foundation Design
|
IR. LIEW SHAW SHONG |
23/2/2009
|
Chemical Testing
|
MS. TAN SJE TING |
24/2/2009
|
Geotechnical Engineering Challenges for Highway Design and Construction
|
IR. DR. GUE SEE SEW |
2/3/2009
|
Procedure for Quality Records |
IR. LEE PEIR TIEN |
3/3/2009
|
Cone Penetration Test (CPT/CPTU) |
MR. TING DENG ING |
10/3/2009
|
Deep Foundation |
MR. BRYAN LEE CHEE BOON |
17/3/2009
|
Static Pile Load Test |
MR. DARRYL FONG CHEW CHUNG |
19/3/2009
|
FEM Analysis for Embankment Over Softground Area
|
MR. KOO KUAN SENG |
23/3/2009 |
Construction of Retaining Wall (RC & RS) on Fill Ground |
MR. ASIF BIN ABDULLAH SHAH AIMIN |
26/3/2009 |
Pile Strip Raft Construction at Bandar Bukit Raja, Klang |
MS. NUR HAYATI bte ABDUL RAHMAN |
31/3/08 |
High Strain Dynamic Pile Test |
MR. FONG FEI SEONG |
29/4/08 |
Application of Consolidation Theory to Practise |
IR. SHAFINA SABARUDDIN |
| 14/4/2009 |
Ground Improvement |
IR.SHAFINA SABARUDDIN |
| 16/4/2009 |
Procedure for Design, Review, Verification & Validation |
MR. TAY JOO KING |
| 23/4/2009 |
RC Wall Design Basis for Electrified Double Tracking Project |
MR. TING DENG ING |
28/4/2009 |
Jack-in Pile (RC & Spun) |
MR. FONG FEI SEONG |
| 30/4/2009 |
ABF Cooling Tower Foundation and Design Issues |
MR. LIM FANG LIANG |
7/5/2009 |
Foundation on Granite Formation - Lessons Learnt from Neo Damansara |
IR. HO SHU FENG |
12/5/2009 |
Driven Pile (RC & Spun) |
IR. HO SHU FENG |
| 21/5/2009 |
Summary of Understanding Contract (Part 1) |
MR. WONG YIK FONG |
| 21/5/2009 |
Procedure for Document and Data Control |
MS. LAU LIH SIONG |
| 26/5/2009 |
Reinforced Concrete (RC) Wall |
MR. WONG YIK FONG |
| 28/5/2009 |
Top-Down Construction |
MS. LOH YEE ENG |
| 9/6/2009 |
Soil Nail |
IR. TING DENG ING |
| 10/6/2009 |
Bored Pile Construction at Kampung Berembang |
IR. LEE SEONG TATT |
| 11/6/2009 |
Hazard & Risk Assessment |
DR. WONG SHIAO YUN |
| 18/6/2009 |
Introduction to ISO Standard |
IR. CHEAH SIEW WAI |
| 23/6/2009 |
Prefabricated Vertical Drain (PVD) |
IR. SHAFINA SABARUDDIN |
| 25/6/2009 |
Pile Foundation |
MS. NOOR AZLINA bte AZHARI |
| 2/7/2009 |
Pile Strip Raft at Batu Pahat (Part 2) |
MR. JEREMY LIM WEI |
| 7/7/2009 |
Geotechnical Data-Evaluation of CPT Testing |
IR. SHAFINA SABARUDDIN |
| 9/7/2009 |
Investigation Into Tank Foundation Failure |
MR. TING DENG ING |
16/7/2009 |
Basement Excavation for Platinum Park |
IR. KHOO CHEE MIN |
| 21/7/2009 |
Geotechnical Data-Shear Strength Derivation |
IR. LOW CHEE LEONG |
23/7/2009 |
Procedure for Internal Quality Audit |
MS. DIANA bte CHE LAT |
| 30/7/2009 |
Double Track |
IR. LEE PEIR TIEN |
| 4/8/2009 |
Shallow Foundation |
IR. CHEAH SIEW WAI/MR. CHOONG KIEAN WUI |
6/8/2009 |
Pile Design and Analysis |
MS. LAU LIH SHIONG |
| 13/8/2009 |
Pile Strip Raft at Batu Pahat (Part 3) |
MR. SIMON LOW YEW HUP |
| 18/8/2009 |
Pile Foundation |
DR. WONG SHIAO YUN/MR. LEE CHEE BOON |
20/8/2009 |
Procedure for Site Supervision Plan |
MS. NOOR AZLINA bte AZHARI |
27/8/2009 |
Earthwork Design for Taman Bukit Kepayang |
MS. TEI CHEW LING |
1/9/2009 |
Retaining Structures-External Stability (RC Wall & Gravity Wall) |
IR. HO SHU FENG |
3/9/2009 |
Introduction to Peat |
MR. WONG CHEN JACK |
10/9/2009 |
Atterberg Limit/PIT Test |
MR. FONG FEI SEONG |
15/9/2009 |
Retaining Structures-External Stability (Reinforced Soil Wall) |
IR. DARRYL FONG CHEW CHUNG |
17/9/2009 |
Procedure for Client Feedback |
MS. NURUL AINAA bte SELAMAT |
24/9/2009 |
Write Like a Professional |
IR. LOW CHEE LEONG |
29/9/2009 |
Retaining Structures-External Stability (Embedded Wall) |
MR. FONG FEI SEONG (IR. TAN YEAN CHIN) |
1/10/2009 |
Foundation Design Consideration for Warehouse |
MR. CHOONG KEAN WUI |
| 8/10/2009 |
Interaction Factor Between Two Dissimilar Pile |
MR. WONG KAM HEA |
| 13/10/2009 |
Hydraulic Failure |
MR. KOO KUAN SENG |
15/10/2009 |
Interpretation of Piezocone |
MR. AHMAD SYAZWAN BIN MOHD SUKARNO |
22/10/2009 |
Procedure for Product Identification and Traceability |
MR. BRYAN LEE CHEE BOON |
27/10/2009 |
Standard Penetration Test |
IR. KHOO CHEE MIN |
| 29/10/2009 |
Role of Geotechnical Engineer |
IR. LIEW SHAW SHONG |
5/11/2009 |
Interpretation of High Strain Dynamic Load Test |
MR. DARRYL FONG CHEW CHUNG |
10/11/2009 |
Mackintosh Probe |
IR. KHOO CHEE MIN |
| 12/11/2009 |
Design of Lateral Pile |
MR. BRYAN LEE CHEE BOON |
| 19/11/2009 |
ISO 9001 Overview |
MR. ROBIN WONG KAH HOE |
| 24/11/2009 |
Permeability Test |
MR. CHOONG KEAN WUI |
| 26/11/2009 |
Proposed Development at MK20 |
MR. LIM FANG LIANG |
3/12/2009 |
Embankment Modeling (FEM) |
MR. KOO KUAN SENG |
8/12/2009 |
Vane Shear Test |
IR. LEE PEIR TIEN/IR. SHAFINA SABARUDDIN |
10/12/2009 |
Pile Testing |
MS. TAN SJE TING |
17/12/2009 |
Foundation Settlement (Prediction: An Approximate Method) |
MR. ROBIN WONG KAH HOE |
22/12/2009 |
Point Load Test |
IR. LEE SEONG TATT |
24/12/2009 |
Procedure on Role of Checker & Reviewer |
MR. LEE WEI CHEN |
22/12/2009 |
Point Load Test |
IR. LEE SEONG TATT |
Note: The above schedule is subject to changes from time to time.