| Recently Completed |
| R&D Topics Completed in 2011 |
| |
1. |
Spreadsheet for Digitising Caquot & Kerisel Design Table for earth pressure coefficients |
| |
2. |
Spreadsheet for Review on Bearing Capacity calculation based on Eurocode 7 |
| |
3. |
Spreadsheet for compile and review on typical details of RC Wall that had been used in projects |
| |
4. |
Spreadsheet to carry out manual calculations based on the confirmed design approaches and basis for review |
| |
5. |
OP for soil nail input in SLOPE W |
| |
6. |
OP for individual pad design to justify on nail head load |
| |
7. |
OP for grid beam design |
| |
8. |
Spreadsheet for grid beam design |
| |
9. |
Spreadsheet for back-calculated Bending moment Diagram from Deflection Profile |
| |
10. |
Spreadsheet for temporary ground anchor design |
| |
11. |
Spreadsheet for shear reinforcement for circular section |
| |
12. |
Spreadsheet for wall stiffness EI for hard/hard secant pile wall |
| |
13. |
Spreadsheet for reinforcement design for hard/hard secant pile wall. |
| |
14. |
Spreadsheet for steel decking design based on area load |
| |
15. |
OP for design of dewatering/recharge wells and design of groundwater control based on CIRIA C515 & design of dewatering/recharge wells |
| |
16. |
Spreadsheet for micropile design |
| |
17. |
Spreadsheet for PVD design |
| |
18. |
Compilation on settlement monitoring results |
| |
19. |
Technical Manual for SI Planning of Tunnelling Works |
| |
20. |
Checklist for method of logging for SI boreholes for tunnel project |
| |
21. |
Spreadsheet for interpretation of Working Pull Out Test |
| |
22. |
Spreadsheet for Lateral Pile (Elastic only) |
| |
23. |
Spreadsheet for automation in Grapher Plotting |
| |
24. |
Spreadsheet for Workload Monitoring |
| |
25. |
Technical Paper on Taiping Portal |
| |
26. |
Design of filter |
| |
27. |
Spreadsheet for AGPC for Bored Pile V 1.2 |
| |
28. |
Spreadsheet for AGPC for Caisson Pile V1.0 |
| |
29. |
Spreadsheet for Static Load Test Using Kentledge Method V1.4 |
| |
30. |
Database of Accreditted Contractor |
| |
31. |
OP for Tender Interview Checklist for Earthworks (TQ) |
| |
32. |
Spreadsheet to check and verify RC wall manual calculations based on the confirmed design approaches |
| |
| On-going: |
| |
1. |
Spreadsheet to extract Caquot & Kerisel's coefficients |
| |
2. |
Spreadsheet for RC Wall Design |
| |
3. |
Sensitivity study on soil parameters for slope stability |
| |
4. |
Spreadsheet for individual pad design |
| |
5. |
Standard drawing for compilation of soil nail head details (shotcrete facing, individual pad & grid beam) |
| |
6. |
OP / TM for strutting design |
| |
7. |
OP / TM for deep excavation design |
| |
8. |
Spreadsheet for temporary ground anchor design (steel bracket design) |
| |
9. |
Spreadsheet for tension pile design |
| |
10. |
Spreadsheet for steel decking design based on HA/ HB loading |
| |
11. |
Spreadsheet for bored pile design |
| |
12. |
OP / TM for compilation of instrumented pile load test for bored pile for interpretation of ks value |
| |
13. |
Spreadsheet for interpretation of odeometer test results |
| |
14. |
Spreadsheet for consolidation settlement to consider buoyancy effect |
| |
15. |
Spreadsheet for CIU test interpretation to incoporate MSR and MDS |
| |
16 |
Revised RS Wall design Spreadsheet to consider ground water level |
| |
17. |
Spreadsheet for building damage assessment & Building Condition Survey |
| |
18. |
Spreadsheet for reduction of existing pile capacity due to tunnelling |
| |
19. |
Technical manual for Guideline on Tunnel Instrumentation |
| |
20. |
Standardize BOQ for Rubble Wall |
| |
21. |
Spreadsheet for Cost Estimation for RC wall (AD028) |
| |
22. |
Parametric Study for Pile Raft Analysis (Pile Spacing = 6.0m, Raft = 0.4m thk) |
| |
23. |
Parametric Study for Pile Raft Analysis (Pile Spacing = 4.0m, Raft = 0.4m thk) |
| |
|
|